Ask for a schedule you can actually compare

Separate processing time, queues, approvals and delivery before relying on a lead-time estimate.

The starting question

When does the clock start, and which events must happen before the next step can begin?

Exploded CAD study showing individual assembly components
Portfolio illustration. No delivery schedule is inferred from this assembly.

For your own project

Which part do you need help with?

Start with what you know. Keep the undecided details open for discussion.

  1. You bring

    An idea, a rough sketch or an example of the problem.

  2. We can help explore

    Possible shapes, features and a clearer concept to discuss.

  3. Discuss next

    What must it do, and which questions matter most?

Describe my project →See the questions to consider ↓

Define the start and finish

Ask whether lead time starts at order acceptance, payment, released files or material availability. Define whether the end means ready to ship, shipment or arrival. Record the revision, quantity and deliverables covered by the answer.

Keep a requested deadline separate from a supplier-confirmed commitment. This checklist does not predict ProtoChat availability or replace a quote.

Separate duration from dependency

List material supply, programming, setup, machining, outside processing, inspection and documentation as relevant to the actual job. Ask which steps wait for another step and which can overlap. Record queue, transport, holidays and customer approvals separately.

For an invented example, three sequential phases of 2, 3 and 1 working days sum to 6 working days. If the first two genuinely start together and the final phase waits for both, the same phase durations give max(2, 3) +1 =4 working days before any omitted delays. This is dependency arithmetic, not a promised schedule.

Leave missing information open

Our inherited TPM lead-time tool labels its material, complexity, quantity and documentation factors as illustrative. Those factors are not imported as verified supplier lead times or industry requirements.

Ask the supplier what happens after a revision change, unavailable material, inspection hold or delayed approval. Record the basis and date of the answer; do not fill an unknown phase with a generic default and present the total as confirmed.

Bring this to the review

Your working checklist

Use these prompts to record open questions. Checking a box does not approve a design or manufacturing process. Selections last for this page visit.

Compare quantities using your own cost inputs

Planning guidance and illustrative examples. Confirm project-specific requirements with the responsible design, manufacturing and quality teams.